Property Overview
DPS Palladio is a premium residential development by BP Infra Group, situated in the high-growth corridor of Sultanpur Road, Lucknow. Part of the 215-acre Pintail Park City integrated township, the project is designed to offer a blend of classical "Palladian" architectural inspiration and modern luxury living. Project Overview Developer:...
Development Status
1
Availability
Yes Available
Possession
Ready to Move
Authorised By
Lucknow Development Authority LDA Approved
RERA No.
UPRERAxxxx
Amenities
Gym
Park
Yoga and Meditation Center
Swimming Pool
Car Parking
Community Center
Kids Play Area
Kids Activity Zone
Club House
Salon
Bank Loan Approved From
This project is pre-approved for home loans by the following banks.
.jpg)
Axis Bank

Bank of Baroda
Bank of India
Canara Bank
Central Bank

Citibank

HDFC Bank

ICICI Bank

IDBI Bank
Indian Bank

LIC HFL

Punjab National Bank

State Bank of India

Union Bank
Description
DPS Palladio is a premium residential development by BP Infra Group, situated in the high-growth corridor of Sultanpur Road, Lucknow. Part of the 215-acre Pintail Park City integrated township, the project is designed to offer a blend of classical "Palladian" architectural inspiration and modern luxury living.
Project Overview
- Developer: BP Infra Group (BP Infra India LLP).
- Location: Mastemau, Sultanpur Road (Opposite Amul Dairy), Lucknow.
- RERA ID: UPRERAPRJ717338/01/2025.
- Land Area: Approximately 2.71 acres with 60% open space.
- Configuration: 4 Towers (A, B, C, & D) with G + 14/15 floors and roughly 308 units.
- Possession Date: Estimated by November 2029 (though some developer sources mention earlier construction milestones in 2026/2028).
Key Features & Amenities
The project emphasizes "affordable luxury" and high-end lifestyle facilities:
- Recreation: A state-of-the-art Clubhouse (approx. 35,000 sq. ft. of rejuvenation space), swimming pool, and a kids' pool.
- Fitness & Sports: Gymnasium, yoga and meditation zones, jogging/strolling tracks, and outdoor tennis/badminton courts.
- Safety & Security: 3-tier to 5-tier security system with 24/7 CCTV surveillance and gated access.
- Smart Design: Earthquake-resistant RCC frame structure and "Sunken Technique" washrooms for better maintenance and waterproofing.
Unit Configurations & Pricing
Apartments feature high ceilings and grand windows to maximize natural light and ventilation.
Updated Price List with Basement car Parking
Basic Selling Price -7250
| Configuration | Typical Size (Super Area) | Starting Price (Approx.) |
|---|---|---|
| 2.5 BHK (2BHK + Study) | 1,450 sq. ft. | 1.2157CR |
| 3 BHK | 1,650 sq. ft. | 1.38CR |
| 3 BHK + Servent Quarter | 2,000 sq. ft. | 1.66CR |
| 4 BHK (+ Servant) | 2,250 sq. ft. | 1.86CR |
Note- The Above Price Will Vary According to Unit and floor
Strategic Location Advantages
The project is located in a rapidly developing hub near major IT and lifestyle centers:
- Connectivity: Quick access to Shaheed Path and the upcoming Outer Ring Road.
- Proximity to Hubs:
- HCL IT City: 1 minute drive.
- Medanta Hospital: 10 minutes drive.
- Phoenix Palassio Mall: 15 minutes drive.
- Ekana International Stadium: 10 minutes drive.
- Lucknow Airport: 25 minutes drive.
Payment Plans
The project typically offers flexible payment structures, such as a Construction Linked Plan (CLP) or a 30:30:30:10 milestone-based plan to assist investors and homebuyers.
Table 1: Project & Payment Plan Overview
| Field | Details | Field | Details |
|---|---|---|---|
| Project Name | DPS Palladio | Effective Date | March 1, 2025 |
| Developer | BP Infra Group | Bank Name | Bandhan Bank |
| Plan Type | Construction Linked Payment Plan (CLP) | Account Name | BP INFRA INDIA LLP-Coll A/C-DPS PALLADIO |
| RERA Reg. No. | UPRERAPRJ717338/01/2025 | Account Number | 20200072886935 |
| IFSC Code | BDBL0001908 | ||
Table 2: Construction Linked Payment Schedule
| S.No. | Time Period / Milestone | Payment % |
| 1 | Allotment Amount | 10% of BSP + GST |
| 2 | On Commencement of Excavation | 10% of TSP + GST |
| 3 | On Completion of Foundation | 10% of TSP + GST |
| 4 | On Commencement of Casting Stilt Slab | 5% of TSP + GST |
| 5 | On Commencement of Casting 1st Floor Slab | 5% of TSP + GST |
| 6 | On Commencement of Casting 3rd Floor Slab | 5% of TSP + GST |
| 7 | On Commencement of Casting 6th Floor Slab | 5% of TSP + GST |
| 8 | On Commencement of Casting 8th Floor Slab | 5% of TSP + GST |
| 9 | On Commencement of Casting 10th Floor Slab | 5% of TSP + GST |
| 10 | On Commencement of Casting 12th Floor Slab | 5% of TSP + GST |
| 11 | On Commencement of Casting 14th Floor Slab | 5% of TSP + GST |
| 12 | At the Starting of Plaster Work | 5% of TSP + GST |
| 13 | At the Starting of Flooring | 10% of TSP + GST |
| 14 | At the Start of Plumbing Work | 10% of TSP + GST |
| 15 | At Time of Possession | 5% of TSP + GST |
Keyword : DPS Palladio Lucknow, DPS Palladio Sultanpur Road, BP Infra Group Projects, Luxury Flats In Lucknow, 3 BHK Apartments Sultanpur Road, GharDhudho Real Estate, Property In Mastemau Lucknow, RERA Registered Projects Lucknow, DPS Palladio Price List, Buy 4 BHK Flat Lucknow.
0.0
0 review
No reviews yet — be the first to share your experience.











